Attention: Our phone systems are currently down. We apologize for any inconvenience this may cause.

Embroidery Cost Calculator

Build a job, see your true cost, then choose a selling price using clear margin options.

Build the job

Use the main fields for a quick quote. Expand the blue optional sections below to add more accurate data such as staff, overheads, timing allowances and consumables.

Choose a popular blank or select custom to enter your own garment cost.
Choose a preset design size or enter a custom stitch count.
Backing area is used to calculate backing cost. Example: 10cm x 10cm = 100cm². Default is 2 plies because many jobs use two pieces of backing.
Choose a preset speed or enter your own stitches per minute.
Update this for the machine being quoted. Used for reference depreciation only.
One-off charge for artwork setup, digitising and job preparation.
Staff — optional
Minimum wage / base pay rate.
NI, pension and employment costs.
Used in the job cost calculation.
Staff used 1
Labour hours charged 0.00
Labour cost £0.00
Switch this on to include labour in the job cost. Leave it off if you want a machine/materials-only cost. Use this section to adjust wage, employer on-cost and staff count.
Operating costs and consumables
Direct machine running cost only: electricity, servicing, repairs, oil and maintenance. This does not include optional business overheads.
Auto-calculated from top thread, bobbin and backing. Top thread uses: stitches ÷ 1,000 × 5m × (£6.35 ÷ 5,000m). Backing uses the selected area and number of plies.
Consumables breakdown
Top thread£0.00
Bobbin£0.00
Backing£0.00
Default is 2 pieces of backing per item. Adjust if you use more or less.
Depreciation per hour = machine purchase price ÷ 5 years ÷ 12 months ÷ 22 business days ÷ production hours per day. Machine depreciation is reference only and is not added separately. Machine running cost is direct machine cost; optional business overheads are only added when enabled. Consumables are calculated as thread + bobbin + backing.
Production time allowances
Stitch time 0 mins
Handling time 0 mins
Total production time 0 mins
Productivity adjustment Standard
These allowances cover real production tasks such as framing garments, changing/checking bobbins, thread breaks, unloading and finishing. SWF Dual options reduce total calculated production time by up to 25%.
Advanced design timing — optional
Colour change time 0 mins
Trim / movement time 0 mins
Advanced design time 0 mins
Leave this off for the default quick quote. Turn it on for designs where colour changes, trims and pantograph movements materially affect production time.
Business overheads — optional
Example: 22 business days × 7 production hours.
Total monthly overheads £0.00
Overhead per hour £0.00
Added to this job £0.00
Leave this switched off for direct production cost only. Turn it on when you want the job to also contribute towards rent, insurance, software, utilities and other wider business costs.